100 kVA Transformer Price

Updated 17 Nov 2026 · GST extra

Indicative ranges. Final price depends on spec, winding, star rating and supplier.

100 kVA transformer price

100 kVA, aluminium

  • 100 kVA

    The most searched size

    Rs 1.48-1.81 lakh

Nearby sizes, aluminium

  • 63 kVA

    Rs 1.03-1.26 lakh

  • 160 kVA

    Rs 2.49-3.04 lakh

  • 200 kVA

    Rs 3.04-3.43 lakh

  • 250 kVA

    Rs 3.43-3.84 lakh

Copper winding, rough guide

  • 100 kVA

    Rs 1.7-2.08 lakh*

  • 160 kVA

    Rs 2.86-3.5 lakh*

  • 200 kVA

    Rs 3.5-3.94 lakh*

  • 250 kVA

    Rs 3.94-4.42 lakh*

Copper at 63 kVA: ask for a quote.

For private buyers: factories, builders, housing societies, hospitals and solar EPC firms. One unit, 11 kV to 433 V, oil-cooled, ex-works. PingB2B indicative price ranges, as of 17 Nov 2026. Final price depends on spec, winding, star rating and supplier; GST extra. Estimated from published rate lists and 2026 listings, updated to current input costs. A real quote varies with brand, star rating and winding. Copper bands are a rough guide: no published source gives the copper premium. Ranges marked * have fewer prices behind them, so treat them as a rough guide.

Full list from 25 to 1000 kVA: distribution transformer price guide.

Which 100 kVA unit to choose

Choose by site and running hours.

Oil-typeLower

Outdoor sites

Oil-immersed units are cheaper and stand outdoors.

Dry-type (cast resin)Roughly a third more

Indoor, fire-sensitive places such as hospitals and malls

Dry-type has no oil. It costs roughly a third more than an oil-type unit of the same rating.

Aluminium windingLower

Cost-led buyers, and the usual choice for smaller ratings

Aluminium costs less. Ask every supplier to quote the same winding.

Copper windingHigher

Critical or process feeders; compact units

Copper costs more and makes a more compact unit. Consultants often specify it for critical or process feeders. The copper bands are a rough guide.

Higher star ratingUsually higher

Long running hours

BEE star rating, 1 to 5. A higher star wastes less energy. Name the star rating in your request.

On-load tap changerMuch higher

Sites with large voltage swings

Off-load is standard. On-load costs much more. Choose it only if your supply voltage varies a lot.

Builders, housing societies, campuses, warehouses and light industry usually buy aluminium. Consultants often specify copper for critical or process feeders. State the winding in your request.

What decides the price

Check that quotes match on each of these.

kVA rating
The size of the load. Ask your electrical contractor or consultant to size it for your load and future growth.
Winding
Copper or aluminium.
Star rating
BEE 1 to 5 star.
Voltage class
The ranges are for 11 kV to 433 V. A higher incoming voltage, such as 22 kV or 33 kV, costs more.
Oil-type or dry-type
Dry-type costs more.
Tap changer
On-load costs much more than off-load.
Oil
An oil-cooled 100 kVA unit needs a first fill of about 190 litres. Check whether the quote includes it.
Metal and oil prices
Copper is up about 28% and aluminium about 21% over the year to 16 Nov 2026. The electrical steel in the core is largely imported. Base oil, the raw material for transformer oil, has also risen. Ask how long a quote is valid.
Delivery, installation and GST
Quoted separately. The ranges exclude GST.

How to buy a 100 kVA unit

Suppliers quote on request. A precise request gets a closer quote.

What to send

  • kVA and number of units.
  • Incoming voltage (11, 22 or 33 kV) and 433 V output.
  • Oil-type or dry-type, indoors or outdoors.
  • Winding.
  • BEE star rating.
  • Tap changer, if you know it.
  • Site, city and the date you need delivery.
  • Whether you need installation and commissioning in the quote.

The usual steps

  1. 1Send the same spec to every supplier.
  2. 2Compare quotes on the same winding and star rating. Ask how long each quote is valid.
  3. 3Ask for the BIS certificate and the test report.
  4. 4Plan the foundation, transport and installation. Ask your contractor and DISCOM what approval your site needs before it is energised.
  5. 5Inspect the unit on delivery, then commission it.

Timing: From 1 January 2027, a new BEE loss table applies to 16-2,500 kVA units up to 11 kV. Ask your supplier which norms your order falls under.

Need help buying?

Here’s how PingB2B works.

  1. Shortlist sellers

    Pick sellers as per your requirement.

  2. Quote comparison

    Same spec, prices you can compare.

  3. Pre-dispatch check

    We send photos before it leaves.

  4. Freight arranged

    We sort shipping and paperwork.

  5. Payment release

    You pay after approving the goods.

100 kVA price: questions

What is the 100 kVA transformer price?
As of 17 Nov 2026, a 100 kVA oil-cooled transformer is priced at Rs 1.48-1.81 lakh per unit with aluminium winding and roughly Rs 1.7-2.08 lakh with copper winding, GST extra. Star rating and tap changer can move the final price. Delivery and installation are quoted separately. Suppliers quote on request.
What decides the price of a 100 kVA transformer?
Winding material, star rating, voltage class and the supplier's make decide it most. Copper winding costs more than aluminium. Higher voltage class costs more. Copper is up about 28% and aluminium about 21% over the year to 16 Nov 2026, so quotes move. Ask how long a quote is valid.
How much oil does a 100 kVA transformer need?
An oil-cooled 100 kVA transformer at 11 kV typically needs a first fill of about 190 litres of transformer oil. The first fill is quoted separately. Transformer oil is sold in 210-litre barrels. Ask whether the supplier's quote includes the first fill before you compare prices.
Do I need approval before energising a 100 kVA transformer?
Rules depend on the voltage and your state. Above the voltage your state notifies, an Electrical Inspector must approve the installation before it is energised. Below it, self-certification may apply. Ask your electrical contractor and your DISCOM what applies to your site.
Is BIS certification mandatory for a 100 kVA transformer?
BIS certification to IS 1180 (Part 1):2014 is compulsory for oil-immersed distribution transformers up to 2,500 kVA and 33 kV. A 100 kVA oil-cooled unit falls in that range. Ask the supplier for the BIS certificate and the test report before you order.